4.2.11 Manage a Risk Evidence

 

Once a Risk Evidence Item is created, it is possible to edit and send the Evidence through its workflow cycle with the use of Item Query results panel.



4.2.11.1 Locate a Risk Evidence

 

  1. Navigate to the Workspaces Tab
  2. Click on the Item Query icon (Item Query windows appears)


  • Alternatively Click on the Item Query icon on the left hand side



  1. Expand the Where Item Type Is menu


Item Query - Where Item Type Is Search Criteria


  1. Select Evidence
  2. Specify other relevant Search Criteria
  3. Click Search
  4. Select required Evidence


Item Query – Evidence Search Results



4.2.11.2 Revising a Risk Evidence

 

  1. On the Welcome Page select Item Query
  2. Enter the name or part of the name of the Control in the All or part of the item: field
  3. In Where item type is select Evidence
  4. On required Risk Evidence right click on the Risk Evidence and select Action Item


Item Query > Risk Evidence > Showing Right Mouse Button Options


  1. The Item Workflow screen is displayed


Item Workflow Screen


  1. Select the Revise checkbox
  2. Add in a revision statement in the Action Comment field
  3. Click Action
  4. Click Ok
  5. Click Close
  6. On the Item Query Screen click Search to refresh the results, the Evidence to be revised is now shown as Draft Status
  7. Select Evidence
  8. Check Out the Evidence
  9. Once the Item is Checked Out it is possible to Edit the:


 


Note that editing a Risk Evidence follows the same steps as creating a Risk Evidence, for more information refer to Section 4.1.16



4.2.11.3 Editing an Evidence Item Using Override

 

  1. Click the Check Out icon


  • If the Item is already Checked Out to you please skip this step
  • If the Item is Checked Out to other User and you have Control Override you will be able to Override their Check Out and Check the Item out to yourself
  • If you do not have Control Override you cannot Check Out the item to yourself



  1. Once the Item is Checked Out it is possible to Edit the:


 


Note that editing a Risk Evidence follows the same steps as creating a Risk Evidence, for more information refer to Section 4.1.16



4.2.11.4 Risk Evidence Item History

 

  1. Click the History tab
  2. Expand Revision Item History


Item History



4.2.11.5 Preview and Print a Risk Evidence

 

  1. Click the Preview button located in the Item Query results list (Risk Evidence View Item window is opened)



  1. Print the Risk Evidence by clicking the Printer button.




4.2.11.6 View Evidence Relationship

 

  1. Click the View Relationship button under the Item Query results list (Item Relationship Viewer window is opened)



Note that the top represents Links from the Item and the bottom represents Links to the Item.


  1. Click the Top or Bottom buttons (depending on what is available) to view individual links to or from Items



  1. Hover over the linked to or from Item
  2. Click the Designer icon (Item is opened in new window).



4.2.11.7 Action an Evidence

 


  1. On the Welcome page or Workspaces tab, select Item Query
  2. Enter the Number/Title or part of the Number/Title of the Risk Evidence in the All or part of the item: field
  3. In Where item type is: select Risk Evidence
  4. Click Search
  5. On the required Risk Evidence, right-click on the Risk Evidence and select Action Items


Item Query - Showing Right-Click Button Options


  1. The Item Workflow screen is opened where the Risk Evidence (the default workflow for a Risk Evidence is Basic) can have the following set:


  • Send for Review with the Review Task Settings being modified if required - See Section 4.3.4 for details on how to achieve this
  • Set as Reviewed
  • Send for Approval with the Approval Task Settings being modified if required - See Section 4.3.7 for details on how to achieve this
  • Set as Approved
  • Release.